Beck Manufacturing and Plant Capacity, business and finance homework help
Get perfect grades by consistently using our writing services. Place your order and get a quality paper today. Take advantage of our current 20% discount by using the coupon code GET20
Order a Similar Paper Order a Different Paper
Read the “Beck Manufacturing” case study in Chapter 8 of your text. In a three- to four-page paper, address the following:
Case Study
Beck Manufacturing
Al Beck, president of Beck manufacturing, wants to determine the capacity of his facility, which produces steering gears for auto manufacturers. He has asked you to sort through the data and determine the capacity of the system and how that capacity may be increased. The operation is a product layout that produces large numbers of nearly identical products. The process includes milling, grinding, boring, drilling, and assembling, in that order. Each finished product requires one operation on each type of machine. For example, each finished part is processed on one of the five milling machines, one of the seven grinding machines, etc.
The facility runs two 8-hour shifts per day, with a third shift for maintenance. The industrial engineering department has provided you with the following data on present operations. In addition, you have been told that assembly operations, while not unlimited, can be easily changed to meet the need.
Operation | Number of Machines | Run Time per Piece (min.) | % Reject Rate |
Milling | 5 | 2 | 3 |
Grinding | 7 | 3 | 5 |
Boring | 3 | 1 | 2 |
Drilling | 6 | 2.5 | 7 |
- Calculate the capacity of each machine center and the capacity of the system.
- If Beck wants to expand capacity, where should he focus the company’s efforts? How much extra capacity can he get without causing another operation to become the bottleneck?
- How may Mr. Beck expand capacity without purchasing new equipment? Be specific.
- Calculate the capacity of each machine center and the capacity of the system.
- Analyze where the focus of the company’s efforts should be if Beck wants to expand capacity. Determine how much extra capacity he can get without causing another operation to become the bottleneck.
- Suggest ways Beck can expand capacity without purchasing new equipment.
- this paper should be in paragraph form (avoid the use of bullet points) and supported with the concepts outlined in your text and additional scholarly sources.
Submit a three- to four-page paper (not including the title and reference pages). Your paper must be formatted according to APA and must cite at least three scholarly sources in addition to Vonderembse, M. A & G.P. White. (2013). Operations Management. San Diego, CA: Bridgepoint Education Inc.
.
Got stuck with another paper? We can help! Use our paper writing service to score better grades and meet your deadlines.
Get 15% discount for your first order
Order a Similar Paper Order a Different Paper
