Case Study 1, Part 2
Get perfect grades by consistently using our writing services. Place your order and get a quality paper today. Take advantage of our current 20% discount by using the coupon code GET20
Order a Similar Paper Order a Different Paper
Using the information from Deep Water Horizon explosion and the PHL you constructed,
Part 1 Preliminary Hazard List (PHL) Table
Preliminary Hazard List (PHL) Project: Deepwater HorizonDate: 8/19/2018 Prepared by: |
||||
Hazardous Event |
Hazard Category |
Causes |
Consequences |
Recommendations |
High pressure in the hole. |
Physical |
The small diameter of the hole. |
Accumulation of explosive gasses |
Widening of the hole |
Inadequate cementing |
Mechanical |
Lack of a cementing evaluation log. |
Reduction of cement quality down the casing |
Use of an evaluation log. |
Misinterpretation of the pressure tests |
Human |
Lack of test assessment tools |
Invalid and wrong conclusions |
Employment of more than one tool for assessing the tests. |
The rise of reservoir fluids and hydrocarbons at the rig floor |
Chemical |
Lack of an efficient monitoring system |
Ignition of reservoir fluids and associated gasses |
Development of a good working monitoring system. |
Now take the PHL you made in part 1 of this case study and construct a detailed Preliminary Hazard Analysis (PHA) on each item on your PHL. Realize that the PHA takes what your brainstorming session came up with in the PHL and gets a little more into the weeds with such things as causal factors, consequences, and relative risk. These are the things you should focus on in a one to two-page report to your boss. Use the Risk Assessment Matrix to quantify the risks you identify.
Got stuck with another paper? We can help! Use our paper writing service to score better grades and meet your deadlines.
Get 15% discount for your first order
Order a Similar Paper Order a Different Paper
