CIS 517 WEEK five assignment

Get perfect grades by consistently using our writing services. Place your order and get a quality paper today. Take advantage of our current 20% discount by using the coupon code GET20


Order a Similar Paper Order a Different Paper

Assignment 3: VoIP Part 1 (Work Breakdown Structure)

This
assignment contains two (2) deliverables: a summary document to be
delivered in a word processor document format and a Work Breakdown
Structure (WBS) to be delivered in a project file.

Overview
As
the project manager for an IT department, you have been assigned to
manage the project of deploying a new VoIP phone system to the company’s
campus. The campus consists of three (3) different buildings, each with
twenty to fifty (20 to 50) workstations. The project must be completed
in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

1. Write a one to two (1-2) page summary document in which you:

a.
Summarize the project requirements and other assumptions (e.g., budget,
human resources, workload, environmental dependencies, etc.).

b. Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

2. Use Microsoft Project to create a WBS which:

a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.

b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c. Contains Work Breakdown Structure Code for each task.

d.
Presents a duration estimate for each task which results in a duration
estimate for the project not to exceed the requirements described in the
overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

  • Be
    typed, double spaced, using Times New Roman font (size 12), with
    one-inch margins on all sides; citations and references must follow APA
    or school-specific format. Check with your professor for any additional
    instructions.
  • Include a cover page containing the title of the
    assignment, the student’s name, the professor’s name, the course title,
    and the date. The cover page and the reference page are not included in
    the required assignment page length.

The specific course learning outcomes associated with this assignment are:

  • Identify how project management improves the success of information technology projects.
  • Explain the relationship of the scope of a project to the work breakdown structure.
  • Use technology and information resources to research issues in IT project management.
  • Write
    clearly and concisely about issues in IT project management using
    proper writing mechanics and technical style conventions.

Got stuck with another paper? We can help! Use our paper writing service to score better grades and meet your deadlines.

Get 15% discount for your first order


Order a Similar Paper Order a Different Paper
Writerbay.net